We believe in quality.Each section of the panel passes through the inspection during every stage of manufacturing.The final testing ensures that the panel meets the excate requirements.
| Major Machinery |
| For fabrication and powder coating: |
| • CNC turrent machine |
| • Hydraulic press break |
| • Hydraulic shearing machine |
| • 8 tank process plan for pre-treatment of MS enclosures |
| • powder coating plant with backing oven |
| For Busbar work: |
| • PLC based busbar processing machine ( Korean make ) |
| • Hydraulic busbar bending machine |
|
| Major Testing Equipments |
| • 4000A loading transformer for primary injection |
| • 1000A 3 phase loading transformer for primary injection |
| • Test bench with following facilities |
| • secondary injection up to 100A AC / DC |
| • Variable Voltage: 110V - 230V - 440V AC |
| • 240V - 48V - 110V DC |
| • Megger HV tester for routine test |
|